好爽…又高潮了粉色视频,一区二区三区内射美女毛片,亚洲丁香五月激情综合,高潮岳喷我一脸

EN
The flue gas cleaning project of the Nong'an domestic waste incineration power generation project in Changchun City, Jilin Province, contracted by Huaxing East Co., has started construction.
2023.11.29
The flue gas cleaning project of the Nong'an domestic waste incineration power generation project in Changchun City, Jilin Province, undertaken by our company, started construction on September 18, 2021.
The project has a total designed daily incineration capacity of 1,600 tons of domestic waste per day. It will be constructed in two phases. The first phase has a designed processing capacity of 800 tons per day. It is equipped with two 400t/d grate-type waste incinerators and has an annual processing capacity of 292,000 tons. The processing capacity of the second phase project is 800 tons/day. The flue gas treatment adopts the flue gas cleaning process of "semi-dry method (rotating spray reaction tower) + dry method (injection of calcium hydroxide) + activated carbon injection + bag dust collector + fly ash transportation", which is our EPC project.
Jiangsu Huaxing East’s performance in Jilin Province includes multiple projects such as Jilin, Jilin Shulan, Tonghua Meihekou, Changchun Nong'an, Dehui, Changchun Changchun phase I, II, and III, Songyuan, etc.
Click or scan below for more information!

Follow us!

欧美牲交A欧美牲交AⅤ免费真| 熟女丝袜潮喷内裤视频网站| 免费看国产曰批40分钟| 少妇被粗大的猛烈进出动视频| 久久精品九九热无码免贵| 天堂资源中文最新版在线一区|