好爽…又高潮了粉色视频,一区二区三区内射美女毛片,亚洲丁香五月激情综合,高潮岳喷我一脸

EN
The flue gas cleaning project of Nong'an household waste incineration power generation project in Changchun city, Jilin province, constructed by Huaxing Dongfang, passed 72+24 hours trial operation
2024.02.29
The flue gas cleaning project of agricultural household waste incineration power generation project in Changchun city, Jilin province, which was constructed by our company, passed 72+24 hours trial operation on November 02, 2023.
The project has a total designed daily incineration capacity of 1,600 tons of domestic waste per day. It will be constructed in two phases. The first phase has a designed processing capacity of 800 tons per day. It is equipped with two 400t/d grate-type waste incinerators and has an annual processing capacity of 292,000 tons. The processing capacity of the second phase project is 800 tons/day. The flue gas treatment adopts the flue gas cleaning process of "semi-dry method (rotating spray reaction tower) + dry method (injection of calcium hydroxide) + activated carbon injection + bag dust collector + fly ash transportation", which is our EPC project.
Jiangsu Huaxing East’s performance in Jilin Province includes multiple projects such as Jilin, Jilin Shulan, Tonghua Meihekou, Changchun Nong'an, Dehui, Changchun Changchun phase I, II, and III, Songyuan, etc.
Click or scan below for more information!

Follow us!


无遮挡国产高潮视频免费观看| 国产熟女乱子视频正在播放| 色欲AV自慰一区二区三区| 日韩亚洲中字无码一区二区三区| 久久无码AV中文出轨人妻| 色五月最新网址|